Unpacking Integrated Result Based Management (IRBM) Concept
The concept of Integrated Result Based Management (IRBM) was first introduced in Malaysia in 1990 and Zimbabwe first adopted it in 2005 under the guidance of the Malaysian government. In Zimbabwe, before the adoption of RBM, accountability was limited to inputs, that is, what was bought and how...
Saved in:
Main Authors: | , , , |
---|---|
Other Authors: | |
Format: | research article |
Language: | English |
Published: |
EPRA Journals
2023
|
Subjects: | |
Online Access: | https://cris.library.msu.ac.zw//handle/11408/5562 http://ijmrap.com/wp-content/uploads/2022/01/IJMRAP-V4N6P100Y21.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1779905273967673344 |
---|---|
author | Amos Muguti Tonderai Chiunye Chipo Mutongi Precious Kandufa |
author2 | Zimbabwe Open University |
author_facet | Zimbabwe Open University Amos Muguti Tonderai Chiunye Chipo Mutongi Precious Kandufa |
author_sort | Amos Muguti |
collection | DSpace |
description | The concept of Integrated Result Based Management
(IRBM) was first introduced in Malaysia in 1990 and Zimbabwe first
adopted it in 2005 under the guidance of the Malaysian government.
In Zimbabwe, before the adoption of RBM, accountability was limited
to inputs, that is, what was bought and how wisely the money was
spent. This type of scenario breeds an "audit" mentality which may
have ensured that large volumes of books were put in place but
providing little information on whether programmes or projects
achieved their intended outcomes and impacts (Government of
Zimbabwe, 2004). The RBM systems across the globe have been
triggered by the growing concerns and pressure from both internal and
external stakeholders for government to provide more tangible results.
The article unpacks the concept of IRBM and make use of City of
Harare to demonstrate it. |
format | research article |
id | ir-11408-5562 |
institution | My University |
language | English |
publishDate | 2023 |
publisher | EPRA Journals |
record_format | dspace |
spelling | ir-11408-55622023-05-02T07:48:18Z Unpacking Integrated Result Based Management (IRBM) Concept Amos Muguti Tonderai Chiunye Chipo Mutongi Precious Kandufa Zimbabwe Open University Zimbabwe Open University Midlands State University Midlands State University Integrated Result Based Management Accountability Integrated Development Planning (IDP) Result Based Budgeting (RBB) The concept of Integrated Result Based Management (IRBM) was first introduced in Malaysia in 1990 and Zimbabwe first adopted it in 2005 under the guidance of the Malaysian government. In Zimbabwe, before the adoption of RBM, accountability was limited to inputs, that is, what was bought and how wisely the money was spent. This type of scenario breeds an "audit" mentality which may have ensured that large volumes of books were put in place but providing little information on whether programmes or projects achieved their intended outcomes and impacts (Government of Zimbabwe, 2004). The RBM systems across the globe have been triggered by the growing concerns and pressure from both internal and external stakeholders for government to provide more tangible results. The article unpacks the concept of IRBM and make use of City of Harare to demonstrate it. 4 7 58 68 2023-05-02T07:48:18Z 2023-05-02T07:48:18Z 2022 research article https://cris.library.msu.ac.zw//handle/11408/5562 http://ijmrap.com/wp-content/uploads/2022/01/IJMRAP-V4N6P100Y21.pdf en International Journal of Multidisciplinary Research and Publications 2581-6187 open EPRA Journals |
spellingShingle | Integrated Result Based Management Accountability Integrated Development Planning (IDP) Result Based Budgeting (RBB) Amos Muguti Tonderai Chiunye Chipo Mutongi Precious Kandufa Unpacking Integrated Result Based Management (IRBM) Concept |
title | Unpacking Integrated Result Based Management (IRBM) Concept |
title_full | Unpacking Integrated Result Based Management (IRBM) Concept |
title_fullStr | Unpacking Integrated Result Based Management (IRBM) Concept |
title_full_unstemmed | Unpacking Integrated Result Based Management (IRBM) Concept |
title_short | Unpacking Integrated Result Based Management (IRBM) Concept |
title_sort | unpacking integrated result based management (irbm) concept |
topic | Integrated Result Based Management Accountability Integrated Development Planning (IDP) Result Based Budgeting (RBB) |
url | https://cris.library.msu.ac.zw//handle/11408/5562 http://ijmrap.com/wp-content/uploads/2022/01/IJMRAP-V4N6P100Y21.pdf |
work_keys_str_mv | AT amosmuguti unpackingintegratedresultbasedmanagementirbmconcept AT tonderaichiunye unpackingintegratedresultbasedmanagementirbmconcept AT chipomutongi unpackingintegratedresultbasedmanagementirbmconcept AT preciouskandufa unpackingintegratedresultbasedmanagementirbmconcept |