BDO Zimbabwe auditors scheduling and leave control system

BDO Zimbabwe Auditors Scheduling and Leave Control system is an intranet-based application which is ideal to be used in the auditing sector that aims to automate the company’s scheduling and control leave activities to provide convenient services to clients. It allows employees to assign staff to cl...

Full description

Saved in:
Bibliographic Details
Main Author: Muzhanje, Brighton
Language:English
Published: Midlands State University 2017
Subjects:
Online Access:http://hdl.handle.net/11408/2560
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1779905649395630080
author Muzhanje, Brighton
author_facet Muzhanje, Brighton
author_sort Muzhanje, Brighton
collection DSpace
description BDO Zimbabwe Auditors Scheduling and Leave Control system is an intranet-based application which is ideal to be used in the auditing sector that aims to automate the company’s scheduling and control leave activities to provide convenient services to clients. It allows employees to assign staff to clients based on the resources available, inform staff of client schedules through SMS (small message service), notifying management of leave applications that might have concerns over and generate ideal reports for staff. The primary purpose for writing this thesis is to present on the current problems of the existing system that compelled developing the auditors scheduling and leave control system solve the problems of the existing system. Amongst tools used were ASP.Net which is a server side scripting language which supports session handling, SQL server 2008 was used as a database management system, Ozki was used as an SMS gateway, outlook was used as an e-mail platform and the system development life cycle as the development methodology. This document consists of five main phases; Introduction, Planning, Analysis, Design and Implementation phase respectively. The first chapter will describe the background of BDO Zimbabwe, the problem definition, aim and objectives of the project as well as the hypothesis and justification of embarking on the project. Thus this phase will explore the problems identified and the objectives of the study. The second chapter will focuses on how the project development time will proceed, as well as the activities that will be undertaken. At this phase the business case of the project is analyzed and evaluated through various feasibility scenarios. In the third chapter analyses of the current system is done through various information gathering techniques such as interviews, questionnaires, observations and diagrammatically represented. The fourth chapter will describe and diagrammatically present how the new system is going to be developed through context and data flow diagrams, its architectural, physical, database, program and interface designs and finally the fifth chapter will focus on the system coding, testing, installation and maintenance. The implementation phase is the final stage of the system development process where a unique installation strategy is selected such as direct changeover, parallel changeover and phased changeover. A post implementation review is also important as a learning phase and for future project reference.
id ir-11408-2560
institution My University
language English
publishDate 2017
publisher Midlands State University
record_format dspace
spelling ir-11408-25602022-06-27T13:49:05Z BDO Zimbabwe auditors scheduling and leave control system Muzhanje, Brighton Auditing sector Automation BDO Zimbabwe Auditors Scheduling and Leave Control system is an intranet-based application which is ideal to be used in the auditing sector that aims to automate the company’s scheduling and control leave activities to provide convenient services to clients. It allows employees to assign staff to clients based on the resources available, inform staff of client schedules through SMS (small message service), notifying management of leave applications that might have concerns over and generate ideal reports for staff. The primary purpose for writing this thesis is to present on the current problems of the existing system that compelled developing the auditors scheduling and leave control system solve the problems of the existing system. Amongst tools used were ASP.Net which is a server side scripting language which supports session handling, SQL server 2008 was used as a database management system, Ozki was used as an SMS gateway, outlook was used as an e-mail platform and the system development life cycle as the development methodology. This document consists of five main phases; Introduction, Planning, Analysis, Design and Implementation phase respectively. The first chapter will describe the background of BDO Zimbabwe, the problem definition, aim and objectives of the project as well as the hypothesis and justification of embarking on the project. Thus this phase will explore the problems identified and the objectives of the study. The second chapter will focuses on how the project development time will proceed, as well as the activities that will be undertaken. At this phase the business case of the project is analyzed and evaluated through various feasibility scenarios. In the third chapter analyses of the current system is done through various information gathering techniques such as interviews, questionnaires, observations and diagrammatically represented. The fourth chapter will describe and diagrammatically present how the new system is going to be developed through context and data flow diagrams, its architectural, physical, database, program and interface designs and finally the fifth chapter will focus on the system coding, testing, installation and maintenance. The implementation phase is the final stage of the system development process where a unique installation strategy is selected such as direct changeover, parallel changeover and phased changeover. A post implementation review is also important as a learning phase and for future project reference. 2017-07-07T10:47:04Z 2017-07-07T10:47:04Z 2013 http://hdl.handle.net/11408/2560 en open Midlands State University
spellingShingle Auditing sector
Automation
Muzhanje, Brighton
BDO Zimbabwe auditors scheduling and leave control system
title BDO Zimbabwe auditors scheduling and leave control system
title_full BDO Zimbabwe auditors scheduling and leave control system
title_fullStr BDO Zimbabwe auditors scheduling and leave control system
title_full_unstemmed BDO Zimbabwe auditors scheduling and leave control system
title_short BDO Zimbabwe auditors scheduling and leave control system
title_sort bdo zimbabwe auditors scheduling and leave control system
topic Auditing sector
Automation
url http://hdl.handle.net/11408/2560
work_keys_str_mv AT muzhanjebrighton bdozimbabweauditorsschedulingandleavecontrolsystem