Kinematics and Discreet Modelling for Ramp Intersections: Proceedings of EUROCK 2018 – the (International Society for Rock Mechanics) ISRM European Rock Mechanics Symposium: Geomechanics and geodynamics of rock masses. 22 – 26 May 2018. Saint-Petersburg, Russia.

Geotechnical work was conducted in order to identify the required support length and other important parameters in ramp intersections at a deep level gold mine. The investigation included detailed scanline and joint mapping. Discreet models were constructed and eight different excavation orientation...

Full description

Saved in:
Bibliographic Details
Main Authors: Zvarivadza, T., Sengani, F.
Format: Presentation
Language:English
Published: 2022
Subjects:
Online Access:https://onepetro.org/ISRMEUROCK/proceedings-abstract/EUROCK18/All-EUROCK18/ISRM-EUROCK-2018-133/446999
http://hdl.handle.net/11408/4897
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1779905235004686336
author Zvarivadza, T.
Sengani, F.
author_facet Zvarivadza, T.
Sengani, F.
author_sort Zvarivadza, T.
collection DSpace
description Geotechnical work was conducted in order to identify the required support length and other important parameters in ramp intersections at a deep level gold mine. The investigation included detailed scanline and joint mapping. Discreet models were constructed and eight different excavation orientations were analyzed in order to obtain a worst case scenario of mining direction. A sensitivity analysis was conducted and the effect of clamping stresses on the hanging wall was quantified. The probabilistic modeling program, JBlock, was utilized to quantify the probable maximum apex height of blocks forming in the ramp intersections. A geo-domain was constructed making use of all the data acquired and was analyzed. Eight excavations were constructed ranging in mining directions from 0 to 315 degrees. The excavations were assumed to have a dip of 8 degrees to ensure the largest blocks are created, subsequently catering for the worst case scenario. The output data created by the software was scrutinized for failed blocks, and cumulative distribution graphs created. In order to understand the effect of clamping stresses in the hanging wall, the worst case mining direction (180 degrees) was utilized and clamping stresses in the hanging wall were varied from 0 kPa to 30 kPa. A 32% reduction in the 50 percentile apex height was attained when the clamping stress increased to 5 kPa, a 43% reduction was attained when a clamping stress of 10 kPa was applied, and a 48% reduction in apex height was attained when the clamping stress was set to 30 kPa.
format Presentation
id ir-11408-4897
institution My University
language English
publishDate 2022
record_format dspace
spelling ir-11408-48972022-06-28T08:35:23Z Kinematics and Discreet Modelling for Ramp Intersections: Proceedings of EUROCK 2018 – the (International Society for Rock Mechanics) ISRM European Rock Mechanics Symposium: Geomechanics and geodynamics of rock masses. 22 – 26 May 2018. Saint-Petersburg, Russia. Zvarivadza, T. Sengani, F. ramp intersections Discreet Modelling Kinematics excavation orientations Gold mines Geotechnical work was conducted in order to identify the required support length and other important parameters in ramp intersections at a deep level gold mine. The investigation included detailed scanline and joint mapping. Discreet models were constructed and eight different excavation orientations were analyzed in order to obtain a worst case scenario of mining direction. A sensitivity analysis was conducted and the effect of clamping stresses on the hanging wall was quantified. The probabilistic modeling program, JBlock, was utilized to quantify the probable maximum apex height of blocks forming in the ramp intersections. A geo-domain was constructed making use of all the data acquired and was analyzed. Eight excavations were constructed ranging in mining directions from 0 to 315 degrees. The excavations were assumed to have a dip of 8 degrees to ensure the largest blocks are created, subsequently catering for the worst case scenario. The output data created by the software was scrutinized for failed blocks, and cumulative distribution graphs created. In order to understand the effect of clamping stresses in the hanging wall, the worst case mining direction (180 degrees) was utilized and clamping stresses in the hanging wall were varied from 0 kPa to 30 kPa. A 32% reduction in the 50 percentile apex height was attained when the clamping stress increased to 5 kPa, a 43% reduction was attained when a clamping stress of 10 kPa was applied, and a 48% reduction in apex height was attained when the clamping stress was set to 30 kPa. 2022-06-28T08:35:23Z 2022-06-28T08:35:23Z 2018 Presentation https://onepetro.org/ISRMEUROCK/proceedings-abstract/EUROCK18/All-EUROCK18/ISRM-EUROCK-2018-133/446999 http://hdl.handle.net/11408/4897 en open
spellingShingle ramp intersections
Discreet Modelling
Kinematics
excavation orientations
Gold mines
Zvarivadza, T.
Sengani, F.
Kinematics and Discreet Modelling for Ramp Intersections: Proceedings of EUROCK 2018 – the (International Society for Rock Mechanics) ISRM European Rock Mechanics Symposium: Geomechanics and geodynamics of rock masses. 22 – 26 May 2018. Saint-Petersburg, Russia.
title Kinematics and Discreet Modelling for Ramp Intersections: Proceedings of EUROCK 2018 – the (International Society for Rock Mechanics) ISRM European Rock Mechanics Symposium: Geomechanics and geodynamics of rock masses. 22 – 26 May 2018. Saint-Petersburg, Russia.
title_full Kinematics and Discreet Modelling for Ramp Intersections: Proceedings of EUROCK 2018 – the (International Society for Rock Mechanics) ISRM European Rock Mechanics Symposium: Geomechanics and geodynamics of rock masses. 22 – 26 May 2018. Saint-Petersburg, Russia.
title_fullStr Kinematics and Discreet Modelling for Ramp Intersections: Proceedings of EUROCK 2018 – the (International Society for Rock Mechanics) ISRM European Rock Mechanics Symposium: Geomechanics and geodynamics of rock masses. 22 – 26 May 2018. Saint-Petersburg, Russia.
title_full_unstemmed Kinematics and Discreet Modelling for Ramp Intersections: Proceedings of EUROCK 2018 – the (International Society for Rock Mechanics) ISRM European Rock Mechanics Symposium: Geomechanics and geodynamics of rock masses. 22 – 26 May 2018. Saint-Petersburg, Russia.
title_short Kinematics and Discreet Modelling for Ramp Intersections: Proceedings of EUROCK 2018 – the (International Society for Rock Mechanics) ISRM European Rock Mechanics Symposium: Geomechanics and geodynamics of rock masses. 22 – 26 May 2018. Saint-Petersburg, Russia.
title_sort kinematics and discreet modelling for ramp intersections: proceedings of eurock 2018 – the (international society for rock mechanics) isrm european rock mechanics symposium: geomechanics and geodynamics of rock masses. 22 – 26 may 2018. saint-petersburg, russia.
topic ramp intersections
Discreet Modelling
Kinematics
excavation orientations
Gold mines
url https://onepetro.org/ISRMEUROCK/proceedings-abstract/EUROCK18/All-EUROCK18/ISRM-EUROCK-2018-133/446999
http://hdl.handle.net/11408/4897
work_keys_str_mv AT zvarivadzat kinematicsanddiscreetmodellingforrampintersectionsproceedingsofeurock2018theinternationalsocietyforrockmechanicsisrmeuropeanrockmechanicssymposiumgeomechanicsandgeodynamicsofrockmasses2226may2018saintpetersburgrussia
AT senganif kinematicsanddiscreetmodellingforrampintersectionsproceedingsofeurock2018theinternationalsocietyforrockmechanicsisrmeuropeanrockmechanicssymposiumgeomechanicsandgeodynamicsofrockmasses2226may2018saintpetersburgrussia